Web Screens
🏒W1
βš™οΈW2
πŸ“‹W3
πŸ“W4
πŸ“ŠW5
Mobile Screens
πŸ“±M1
βœ“M2
⬇️M3
πŸ“M4
πŸ”’M5
βœ…M6
W1 β€” Super Admin Β· Org-Level NCR Toggle
Click sidebar items to navigate
d
digiQC
πŸ‘€
πŸ β€ΊGR Infraprojects Limited
Details
Users
Organization Details
Organization Name:
GR Infraprojects Limited
System Admin:
Bimlesh Kumar
Email:
bimlesh@grinfra.com
TimeZone:
Asia/Kolkata
Subscription Details
Plan:
Team
Users:
18 / 25
Projects:
3 / 5
Valid Till:
31/03/2027
Addon Services
1. Access Type
a. Inspection
b. Instruction
c. Register
16. EQC β†’ NCR Instruction NEW
EQC Fail β†’ NCR Instruction
Requires Inspection + Instruction both ON
GR
GR Infraprojects
πŸ‘€
πŸ β€ΊNH-58 Highwayβ€ΊEdit Project
Project Details
Location:
Authentication:
RFI:
EQC Fail β†’ NCR Instruction NEW
Show NCR option in bottom drawer when EQC is marked Fail. Only visible to users with Raise Instruction right. Default: OFF
Site Details
πŸ—ΊοΈ Map β€” Haridwar area
GR
GR Infraprojects
πŸ‘€
Logsβ€ΊInspectionsβ€ΊGSB Layer Compaction β€” Stage 2
Fail (NCR)
Checklist
GSB Layer Compaction
Stage
Stage 2 β€” Compaction Check
Inspector
Ramesh Kumar
Location
Ch. 4+200 to 4+600
Submitted
14 Apr 2026, 11:42 AM
Result
Fail (NCR)
πŸ”— Linked NCR Instructions
πŸ”’EQC is blocked β€” inspector cannot continue until NCR-2026-047 is Closed.
πŸ“
NCR-2026-047
Raised
Raised by Ramesh Kumar Β· 14 Apr 2026, 11:45 AM
2 failed checkpoints Β· Auto-filled from Stage 2
Checkpoints (7)
#CheckpointAnswerStatus
1Is subgrade prepared and accepted?YesPASSED
2Is moisture content within range?YesPASSED
3Is material from approved source?YesPASSED
4Is layer thickness as per drawing?YesPASSED
5Is subgrade compaction as per spec?No (88% vs 95%)FAILED
6Is surface free from loose material?No (gravel on 40m)FAILED
7Are levels within tolerance?YesPASSED
Activity
πŸ“ NCR Raised β€” Ramesh Kumar Β· 14 Apr, 11:45 AM
⏳ Awaiting response on NCR-2026-047…
GR
GR Infraprojects
πŸ‘€
Instructionsβ€ΊNCR-2026-047
NCRRaised
Instruction Details
Type
NCR
Location
Ch. 4+200 to 4+600 Β· GSB Layer
Description (Auto-generated)
Question 5/7: Is subgrade compaction as per specification?
Answer 5/7: No β€” Compaction at 88%, minimum required 95%.

Question 6/7: Is surface free from loose material before laying?
Answer 6/7: No β€” Loose gravel on 40m stretch.
Photos (Auto-attached Β· 3)
πŸ–Ό
πŸ–Ό
πŸ–Ό
πŸ”— Linked EQC
πŸ“‹
GSB Layer Compaction β€” Stage 2
Ch. 4+200 to 4+600 Β· NH-58 Highway
Fail (NCR)14 Apr 2026
GR
GR Infraprojects
πŸ‘€
Logsβ€ΊInspections
Showing 3 of 47 records
ℹ️Showing Fail (NCR) entries only β€” EQC inspections where NCR path was selected at Fail.
DateChecklistStageInspectorResultNCRNCR Status
14 Apr 2026GSB Layer CompactionStage 2Ramesh KumarFail (NCR)NCR-2026-047RaisedView β†’
12 Apr 2026WMM Laying CheckStage 1Sunil PatelFail (NCR)NCR-2026-039ClosedView β†’
09 Apr 2026DBM Layer CompactionStage 3Ramesh KumarFail (NCR)NCR-2026-031RespondedView β†’
M1 Β· Inspection List
9:41β€’β€’β€’β€’ WiFi πŸ”‹
NH-58 Highway β–Ό
+ Add
Available (33)
Paused (1)
Approval (9)
Ch. 4+200 / Stage 2
GSB Layer Compaction
Inspect Stage β€” During (2/3)
Fail (NCR)
Ch. 3+000 / Stage 1
WMM Laying Check
Inspect Stage β€” Pre (1/3)
πŸ“ŠDashboard
βœ“Inspection
πŸ“Instruction
πŸ“‹To-Do
M2 Β· EQC Inspection β€” tap Fail to trigger NCR drawer
9:54β€’β€’β€’β€’ WiFi πŸ”‹
β€Ή
GSB Layer Compaction
During (2/3)
5/7FAILED
Is subgrade compaction as per specification?
6/7FAILED
Is surface free from loose material before laying?
7/7PASSED
Are levels within tolerance?
Without Raise Instruction right β€” FAIL only
9:54β€’β€’β€’β€’ πŸ”‹
β€Ή
GSB Layer Compaction
⚠️ Inspection Failed
How do you want to record this failure?
βœ— FAIL
Mark as Failed β€” no corrective action raised
You don't have permission to raise Instructions on this project
With Raise Instruction right β€” FAIL + NCR
9:54β€’β€’β€’β€’ πŸ”‹
β€Ή
GSB Layer Compaction
⚠️ Inspection Failed
How do you want to record this failure?
βœ— FAIL
Mark as Failed β€” no NCR raised
πŸ“ Raise NCR Instruction
Auto-fill from 2 failed checkpoints β€” no re-entry needed
Dismiss (EQC not marked Fail)
M4 Β· NCR Instruction Raise β€” auto-filled
βœ•Raise InstructionSave Draft
Instruction Type
Location Auto-filled
Description Auto-generated
All 2 failed checkpoints combined Β· editable
Photos Auto-attached
πŸ–ΌQ5
πŸ–ΌQ5
πŸ–ΌQ6
From failed checkpoints Β· cannot remove
Deadline
Deadline πŸ“…Wed, 23 Apr 03:53 PM
1 day
2 days
EQC Blocked Β· NCR Raised
11:45β€’β€’β€’β€’ πŸ”‹
β€Ή
GSB β€” Stage 2
πŸ”’EQC BlockedRaised
Inspection blocked. View only until NCR-2026-047 is Closed.
Inspection Details
READ ONLY
5/7FAILED
Is subgrade compaction as per spec?
EQC Blocked Β· NCR Responded
15:20β€’β€’β€’β€’ πŸ”‹
β€Ή
GSB β€” Stage 2
πŸ”’EQC BlockedResponded
Response submitted. Awaiting QC Head review.
EQC Blocked Β· NCR Rejected
09:10β€’β€’β€’β€’ πŸ”‹
β€Ή
GSB β€” Stage 2
πŸ”’EQC BlockedRejected
Response rejected. Correct & re-respond before continuing.
Draft state β€” NCR action pending
11:43β€’β€’β€’β€’ πŸ”‹
β€Ή
GSB β€” Stage 2
⏳NCR action pendingDraft
Draft saved. Open and raise it to proceed. EQC blocked until Closed.
βœ… NCR Closed β€” EQC Unblocked
16:30β€’β€’β€’β€’ πŸ”‹
β€Ή
GSB β€” Stage 2
βœ…NCR Closed β€” Inspection Unblocked
NCR-2026-047 closed by Suresh. You can now continue.
NCR-2026-047 Β· Closed
Multiple NCRs β€” redo cycle
10:15β€’β€’β€’β€’ πŸ”‹
β€Ή
GSB β€” Stage 2
Re-inspection after Redo
πŸ”’EQC BlockedRaised
Blocked by most recent NCR. Previous NCR Closed β€” download below.
Linked NCR Instructions
πŸ“NCR-2026-047Closed
Cycle 1 Β· 14 Apr 2026
πŸ“NCR-2026-061Raised
Cycle 2 (Redo) Β· 19 Apr 2026